Our Permit Submission Is Friday. Which Consultants Still Owe Us Drawings?

Before Thursday Night Becomes the Deadline.

For architects and project managers coordinating structural, MEP and civil consultants by email: one list of the drawings and documents you asked for that haven't arrived, ahead of the submission date.

Quick answer

How do I see which consultants still owe drawings for a submission?

  • Ask alfred_ on Monday, by text or in the app: "Which consultants on the Northgate Clinic project still owe us drawings or documents for Friday's permit submission?"
  • It reads the requests you sent and each reply, attachments included, and lists what has arrived and what hasn't
  • For a standing check, make a routine: "Every weekday at 8, email me what the Northgate consultants still owe us", and turn it off after the submission
  • It sends nothing to consultants. Reminders are written when you ask and sent when you approve them

The deliverables are requested in email and arrive in email. The list of what's missing shouldn't live in your head.

The short answer: ask alfred_, by text or in the app: “Which consultants on the Northgate Clinic project still owe us drawings or documents for Friday’s permit submission?” It reads what you requested and each reply, attachments included, and lists what’s arrived and what hasn’t. For a daily check until the deadline, make it a routine and turn it off afterwards. It sends nothing to consultants on its own.

Thursday night is not a plan

You’re the project architect on a small medical clinic. The permit set goes to the city on Friday. Two weeks ago you emailed the structural engineer for the stamped foundation plan, the MEP engineer for the updated mechanical and plumbing sheets, the civil engineer for the grading plan, and the energy consultant for the compliance forms.

Some came in. Some came in and then were revised. The civil engineer asked a question about the drainage easement that you answered on Tuesday. By Wednesday you’re not sure which of the four you’re still waiting on, and you find out Thursday night when you assemble the PDF.

The native ways, and where they stop

A submission checklist. A spreadsheet of sheets and consultants, updated as files arrive. Accurate the day someone updates it.

Project management software. If consultants upload to your project platform, it tracks submittals there. Many smaller consultants still email PDFs and answer questions in the thread.

Searching your inbox. Search by consultant or project name. You still open each thread to see what arrived and what was promised.

Ask, or make it a routine

  1. Connect the inbox you coordinate the project from. Sign in with Google or Microsoft; your password stays with them.
  2. Ask by text or in the app: “Which consultants on the Northgate Clinic project still owe us drawings or documents for Friday’s permit submission?”
  3. For a standing check, make a routine: “Every weekday at 8, email me what the Northgate Clinic consultants still owe us.” alfred_ shows you the routine before you turn it on. Turn it off after the submission, or ask: “stop the Northgate routine.” See Make your own.

What the answer looks like

Northgate Clinic, permit submission Friday: still outstanding (2)

  1. MEP engineer, Dana Price at Cedar Engineering: updated M and P sheets. Asked Oct 10. Dana replied Oct 17: “Revisions done Wednesday.” Nothing since.
  2. Energy consultant, Sam Ortiz: compliance forms. Asked Oct 10. No reply.

Arrived: stamped foundation plan from the structural engineer (Oct 20, Northgate-S1-S4-Stamped.pdf); grading plan from the civil engineer (Oct 22, after your Tuesday answer on the easement).

Illustrative example, not output from a real run. The project, firms and files are invented.

Where each step happens

  • Desktop: make the routine on the Routines page; read the full threads in your inbox.
  • Phone, on a site visit: ask “what does Northgate still need?” by text.
  • Reminders: “remind Sam we need the energy forms by Thursday noon” writes the email; it goes when you say send.

The honest caveat

alfred_ reads the inboxes you connect, so a file that arrived through a share or a project platform with no email isn’t seen. It judges each thread from what it says, so check the list against your set before you submit. It doesn’t contact consultants on its own. alfred_ is a paid product, and routines run on the credits your plan includes; plans are on the pricing page.

Keep client work from slipping through the cracks

alfred_ is an AI assistant for client-facing teams. Each teammate gets help with email, calendar, replies and follow-ups.

See what’s slipping+ more

Frequently asked questions

How do I see which consultants still owe drawings for a submission?

Connect your Gmail or Outlook to alfred_ and ask, by text or in the app: "Which consultants on the Northgate Clinic project still owe us drawings or documents for Friday's permit submission?" alfred_ reads the requests you sent and each reply, including attachment names, and lists what has arrived and what is still outstanding. For a daily check until the deadline, make a routine in one sentence and turn it off afterwards.

Do I need to tag emails by project?

No, but it helps to name the project the way your emails do: the project name, a job number, or the client. alfred_ searches your mail for it, so a consistent subject line ("Northgate Clinic, permit set") makes the answer more complete.

What if a consultant uploaded drawings to a file share instead of emailing them?

If the share sends you an email when a file is added, alfred_ can read that email. Files that arrive with no email to you aren't something alfred_ sees, so they may show as outstanding until you say otherwise.

Can it send the reminders?

Yes, when you approve them. Ask "remind the structural engineer we need the stamped foundation plan by Thursday noon" and alfred_ writes the email in that thread, shows it to you, and sends it when you say send.

Does the Chase what I'm owed routine work for this?

It covers the requests you made in the last 7 days, every Monday at 8 AM, across all your projects. For one project with a deadline, a routine or question that names the project is more precise.

About the authors

Written byPranav MishraAI/LLM Engineer at alfred_

Pranav builds the agents behind alfred_, the systems that watch your inbox and calendar, keep track of what is waiting on you, and surface what actually needs a response. He runs alfred_’s head-to-head field tests against other assistants.

Reviewed byConnor FataFounder & CEO of alfred_

Connor is the founder and CEO of alfred_, focused on making personal assistants accessible to business operators and individuals so they can focus on what matters and what’s important.